Welcome to Auto, Motorcycle Parts & Accessories official website!
Gearbox Solenoid for Chevrolet Silverado: Nylon 66

Gearbox Solenoid for Chevrolet Silverado: Nylon 66

Gearbox Solenoid for Chevrolet Silverado: Nylon 66This gearbox solenoid for the Chevrolet Silverado is specified around nylon 66, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Gearbox Solenoid for Chevrolet Silverado: Nylon 66

This gearbox solenoid for the Chevrolet Silverado is specified around nylon 66, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Chevrolet Silverado Gearbox Solenoid

Specification

ProductGearbox Solenoid
Vehicle applicationChevrolet Silverado
Material / finishNylon 66
Typical useWeekend Riding
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceSGS
Packing20 pieces per inner box, 500 per carton

Material options

  • Stainless Steel — chosen where wear resistance comes first
  • High Density Foam — selected when the part is exposed to weather and road salt
  • Anodised Aluminium — used when the finish has to hold a coating
  • Bronze — selected when the part is exposed to weather and road salt
  • Carbon Fibre Composite — the cost-effective default for volume programmes

Gearbox Solenoid detail

Processes available

  • powder coating
  • die casting
  • robot welding
  • laser cutting
  • assembly line testing
  • surface grinding

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for weekend riding. Related applications include airport ground fleets, delivery fleets, security patrols, off-road trails, roadside assistance.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top