Welcome to Auto, Motorcycle Parts & Accessories official website!
Wheel Spacer for Mazda CX-5: Cast Iron

Wheel Spacer for Mazda CX-5: Cast Iron

Wheel Spacer for Mazda CX-5: Cast IronThis wheel spacer for the Mazda CX-5 is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a.

Contact Number:
Product Details

Wheel Spacer for Mazda CX-5: Cast Iron

This wheel spacer for the Mazda CX-5 is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Mazda CX-5 Wheel Spacer

Specification

ProductWheel Spacer
Vehicle applicationMazda CX-5
Material / finishCast Iron
Typical useRural Transport
MOQ1,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time15-30 days after approval
ComplianceE-mark
Packing20 pieces per inner box, 1000 per carton

Material options

  • Cast Iron — selected when the part is exposed to weather and road salt
  • Nylon 66 — selected when the part is exposed to weather and road salt
  • Polypropylene — the cost-effective default for volume programmes
  • Tempered Glass — used when the finish has to hold a coating
  • ABS Plastic — the cost-effective default for volume programmes

Wheel Spacer detail

Processes available

  • electroplating
  • ultrasonic cleaning
  • rubber vulcanisation
  • precision stamping
  • powder coating
  • CNC machining

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for rural transport. Related applications include track days, urban courier work, roadside assistance, airport ground fleets, heavy load hauling.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top