Idle Control Valve for Tesla Model 3: Carbon Steel
This idle control valve for the Tesla Model 3 is specified around carbon steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Tesla Model 3 |
| Material / finish | Carbon Steel |
| Typical use | Track Days |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | CCC |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Carbon Fibre Composite — used when the finish has to hold a coating
- PU Leather — used when the finish has to hold a coating
- Reinforced Nylon — preferred when weight matters more than rigidity
- Powder Coated Steel — specified where the part sits close to a heat source
- Polypropylene — preferred when weight matters more than rigidity

Processes available
- laser cutting
- ultrasonic cleaning
- robot welding
- shot blasting
- CNC machining
- die casting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for track days. Related applications include ride-hailing fleets, rural transport, off-road trails, airport ground fleets, motocross.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







