Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Pump for Honda Accord: Sintered Metal

Fuel Pump for Honda Accord: Sintered Metal

Fuel Pump for Honda Accord: Sintered MetalThis fuel pump for the Honda Accord is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to.

Contact Number:
Product Details

Fuel Pump for Honda Accord: Sintered Metal

This fuel pump for the Honda Accord is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or premature wear on the first batch. Both are specification problems, and both are preventable.

Honda Accord Fuel Pump

Specification

ProductFuel Pump
Vehicle applicationHonda Accord
Material / finishSintered Metal
Typical useHeavy Load Hauling
MOQ500 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-30 days after approval
ComplianceRoHS
Packing50 pieces per inner box, 500 per carton

Material options

  • ABS Plastic — chosen where wear resistance comes first
  • Chromed Steel — used when the finish has to hold a coating
  • Magnesium Alloy — selected when the part is exposed to weather and road salt
  • PU Leather — the cost-effective default for volume programmes
  • High Density Foam — the cost-effective default for volume programmes

Fuel Pump detail

Processes available

  • robot welding
  • ultrasonic cleaning
  • heat treatment
  • anodising
  • assembly line testing
  • laser cutting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for heavy load hauling. Related applications include roadside assistance, food delivery, passenger transport, delivery fleets, motocross.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top