Air Suspension Bag for Hyundai i20: Sintered Metal
This air suspension bag for the Hyundai i20 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Air Suspension Bag |
|---|---|
| Vehicle application | Hyundai i20 |
| Material / finish | Sintered Metal |
| Typical use | Heavy Load Hauling |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | E-mark |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Zinc Plated Steel — preferred when weight matters more than rigidity
- Tempered Glass — the cost-effective default for volume programmes
- Bronze — used when the finish has to hold a coating
- High Density Foam — preferred when weight matters more than rigidity
- Carbon Fibre Composite — chosen where wear resistance comes first

Processes available
- robot welding
- precision stamping
- shot blasting
- electroplating
- surface grinding
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include off-road trails, mountain roads, roadside assistance, wet weather riding, night riding.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







