Mud Flap for Changan CS75: ABS Plastic
This mud flap for the Changan CS75 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Mud Flap |
|---|---|
| Vehicle application | Changan CS75 |
| Material / finish | ABS Plastic |
| Typical use | Track Days |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Natural Rubber — the cost-effective default for volume programmes
- High Density Foam — used when the finish has to hold a coating
- Carbon Steel — specified where the part sits close to a heat source
- Stainless Steel — specified where the part sits close to a heat source
- Carbon Fibre Composite — preferred when weight matters more than rigidity

Processes available
- CNC machining
- powder coating
- die casting
- shot blasting
- gravity casting
- injection moulding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for track days. Related applications include long-distance touring, passenger transport, rental fleets, heavy load hauling, wet weather riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







