Parking Sensor for Kia Sorento: Sintered Metal
This parking sensor for the Kia Sorento is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Parking Sensor |
|---|---|
| Vehicle application | Kia Sorento |
| Material / finish | Sintered Metal |
| Typical use | Motocross |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | DOT |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Cast Iron — the cost-effective default for volume programmes
- Zinc Plated Steel — chosen where wear resistance comes first
- PVC Coated Fabric — chosen where wear resistance comes first
- Neoprene — used when the finish has to hold a coating
- Ceramic Composite — selected when the part is exposed to weather and road salt

Processes available
- anodising
- electroplating
- shot blasting
- assembly line testing
- CNC machining
- gravity casting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for motocross. Related applications include rural transport, farm use, construction sites, off-road trails, weekend riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







