Timing Tensioner for Changan CS75: PVC Coated Fabric
This timing tensioner for the Changan CS75 is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Timing Tensioner |
|---|---|
| Vehicle application | Changan CS75 |
| Material / finish | PVC Coated Fabric |
| Typical use | Heavy Load Hauling |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | RoHS |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- ABS Plastic — the cost-effective default for volume programmes
- Forged Aluminium — specified where the part sits close to a heat source
- Carbon Steel — used when the finish has to hold a coating
- Silicone — used when the finish has to hold a coating
- Stainless Steel — preferred when weight matters more than rigidity

Processes available
- sintering
- assembly line testing
- electroplating
- injection moulding
- laser cutting
- anodising
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include passenger transport, delivery fleets, off-road trails, weekend riding, food delivery.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







