Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Filter for Honda Civic: Zinc Plated Steel

Fuel Filter for Honda Civic: Zinc Plated Steel

Fuel Filter for Honda Civic: Zinc Plated SteelThis fuel filter for the Honda Civic is specified around zinc plated steel, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Fuel Filter for Honda Civic: Zinc Plated Steel

This fuel filter for the Honda Civic is specified around zinc plated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Honda Civic Fuel Filter

Specification

ProductFuel Filter
Vehicle applicationHonda Civic
Material / finishZinc Plated Steel
Typical useNight Riding
MOQ2,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time25-30 days after approval
ComplianceTUV
Packing50 pieces per inner box, 500 per carton

Material options

  • Titanium Alloy — chosen where wear resistance comes first
  • Ceramic Composite — specified where the part sits close to a heat source
  • Aluminium Alloy — specified where the part sits close to a heat source
  • Silicone — used when the finish has to hold a coating
  • Powder Coated Steel — preferred when weight matters more than rigidity

Fuel Filter detail

Processes available

  • cold forging
  • precision stamping
  • die casting
  • anodising
  • shot blasting
  • laser cutting

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for night riding. Related applications include farm use, delivery fleets, construction sites, track days, urban courier work.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top