Drive Shaft for Dodge Ram: Bronze
This drive shaft for the Dodge Ram is specified around bronze, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.
![]()
Specification
| Product | Drive Shaft |
|---|---|
| Vehicle application | Dodge Ram |
| Material / finish | Bronze |
| Typical use | Construction Sites |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 10 pieces per inner box, 500 per carton |
Material options
- Forged Aluminium — preferred when weight matters more than rigidity
- Nylon 66 — preferred when weight matters more than rigidity
- EPDM Rubber — the cost-effective default for volume programmes
- Titanium Alloy — the cost-effective default for volume programmes
- Ceramic Composite — specified where the part sits close to a heat source

Processes available
- shot blasting
- powder coating
- CNC machining
- anodising
- injection moulding
- sintering
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include rental fleets, night riding, weekend riding, coastal delivery, heavy load hauling.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







