Timing Chain for Geely Coolray: Titanium Alloy
This timing chain for the Geely Coolray is specified around titanium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Timing Chain |
|---|---|
| Vehicle application | Geely Coolray |
| Material / finish | Titanium Alloy |
| Typical use | Mining Sites |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | TUV |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- ABS Plastic — the cost-effective default for volume programmes
- Polypropylene — preferred when weight matters more than rigidity
- Carbon Steel — chosen where wear resistance comes first
- Cast Iron — used when the finish has to hold a coating
- Powder Coated Steel — selected when the part is exposed to weather and road salt

Processes available
- CNC machining
- electroplating
- die casting
- anodising
- shot blasting
- robot welding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for mining sites. Related applications include long-distance touring, ride-hailing fleets, motocross, roadside assistance, food delivery.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







