Welcome to Auto, Motorcycle Parts & Accessories official website!
Pressure Plate for Chery Tiggo: Tempered Glass

Pressure Plate for Chery Tiggo: Tempered Glass

Pressure Plate for Chery Tiggo: Tempered GlassThis pressure plate for the Chery Tiggo is specified around tempered glass, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Pressure Plate for Chery Tiggo: Tempered Glass

This pressure plate for the Chery Tiggo is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Chery Tiggo Pressure Plate

Specification

ProductPressure Plate
Vehicle applicationChery Tiggo
Material / finishTempered Glass
Typical useTrack Days
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time15-30 days after approval
ComplianceE-mark
Packing50 pieces per inner box, 500 per carton

Material options

  • Polypropylene — chosen where wear resistance comes first
  • Carbon Fibre Composite — used when the finish has to hold a coating
  • Chromed Steel — used when the finish has to hold a coating
  • Brass — used when the finish has to hold a coating
  • Silicone — specified where the part sits close to a heat source

Pressure Plate detail

Processes available

  • electroplating
  • ultrasonic cleaning
  • cold forging
  • rubber vulcanisation
  • die casting
  • gravity casting

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for track days. Related applications include farm use, delivery fleets, rental fleets, roadside assistance, off-road trails.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top