Axle Shaft for Chery Tiggo: Powder Coated Steel
This axle shaft for the Chery Tiggo is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Axle Shaft |
|---|---|
| Vehicle application | Chery Tiggo |
| Material / finish | Powder Coated Steel |
| Typical use | Wet Weather Riding |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Semi-Metallic Compound — preferred when weight matters more than rigidity
- Tempered Glass — specified where the part sits close to a heat source
- Powder Coated Steel — the cost-effective default for volume programmes
- Magnesium Alloy — chosen where wear resistance comes first
- Stainless Steel — used when the finish has to hold a coating

Processes available
- die casting
- electroplating
- assembly line testing
- heat treatment
- precision stamping
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for wet weather riding. Related applications include heavy load hauling, adventure travel, roadside assistance, long-distance touring, off-road trails.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







