Relay for Chevrolet Silverado: ABS Plastic
This relay for the Chevrolet Silverado is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Relay |
|---|---|
| Vehicle application | Chevrolet Silverado |
| Material / finish | ABS Plastic |
| Typical use | Farm Use |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Zinc Plated Steel — the cost-effective default for volume programmes
- Neoprene — selected when the part is exposed to weather and road salt
- Chromed Steel — used when the finish has to hold a coating
- Tempered Glass — the cost-effective default for volume programmes
- PU Leather — selected when the part is exposed to weather and road salt

Processes available
- heat treatment
- gravity casting
- shot blasting
- electroplating
- cold forging
- assembly line testing
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for farm use. Related applications include off-road trails, heavy load hauling, roadside assistance, construction sites, mountain roads.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







