Shock Absorber for BYD F3: Tempered Glass
This shock absorber for the BYD F3 is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | Shock Absorber |
|---|---|
| Vehicle application | BYD F3 |
| Material / finish | Tempered Glass |
| Typical use | Mining Sites |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | ECE R90 |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Carbon Steel — used when the finish has to hold a coating
- PU Leather — specified where the part sits close to a heat source
- EPDM Rubber — preferred when weight matters more than rigidity
- Powder Coated Steel — the cost-effective default for volume programmes
- ABS Plastic — chosen where wear resistance comes first

Processes available
- powder coating
- heat treatment
- CNC machining
- laser cutting
- injection moulding
- shot blasting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for mining sites. Related applications include track days, farm use, rental fleets, airport ground fleets, wet weather riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







