Welcome to Auto, Motorcycle Parts & Accessories official website!
Power Steering Hose for Changan CS75: Magnesium Alloy

Power Steering Hose for Changan CS75: Magnesium Alloy

Power Steering Hose for Changan CS75: Magnesium AlloyThis power steering hose for the Changan CS75 is specified around magnesium alloy, which decides how it behaves in service far more than the part.

Contact Number:
Product Details

Power Steering Hose for Changan CS75: Magnesium Alloy

This power steering hose for the Changan CS75 is specified around magnesium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Changan CS75 Power Steering Hose

Specification

ProductPower Steering Hose
Vehicle applicationChangan CS75
Material / finishMagnesium Alloy
Typical useMotocross
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceDOT
Packing50 pieces per inner box, 1000 per carton

Material options

  • Neoprene — selected when the part is exposed to weather and road salt
  • Tempered Glass — chosen where wear resistance comes first
  • Chromed Steel — the cost-effective default for volume programmes
  • ABS Plastic — the cost-effective default for volume programmes
  • EPDM Rubber — used when the finish has to hold a coating

Power Steering Hose detail

Processes available

  • rubber vulcanisation
  • precision stamping
  • shot blasting
  • laser cutting
  • heat treatment
  • powder coating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for motocross. Related applications include off-road trails, roadside assistance, adventure travel, delivery fleets, coastal delivery.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top