Welcome to Auto, Motorcycle Parts & Accessories official website!
Brake Master Cylinder for Hyundai i20: ABS Plastic

Brake Master Cylinder for Hyundai i20: ABS Plastic

Brake Master Cylinder for Hyundai i20: ABS PlasticThis brake master cylinder for the Hyundai i20 is specified around abs plastic, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Brake Master Cylinder for Hyundai i20: ABS Plastic

This brake master cylinder for the Hyundai i20 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Hyundai i20 Brake Master Cylinder

Specification

ProductBrake Master Cylinder
Vehicle applicationHyundai i20
Material / finishABS Plastic
Typical useConstruction Sites
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-40 days after approval
ComplianceSAE J431
Packing50 pieces per inner box, 1000 per carton

Material options

  • Cast Iron — selected when the part is exposed to weather and road salt
  • Brass — preferred when weight matters more than rigidity
  • Silicone — selected when the part is exposed to weather and road salt
  • ABS Plastic — chosen where wear resistance comes first
  • Natural Rubber — selected when the part is exposed to weather and road salt

Brake Master Cylinder detail

Processes available

  • precision stamping
  • cold forging
  • powder coating
  • assembly line testing
  • anodising
  • injection moulding

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include urban courier work, delivery fleets, coastal delivery, wet weather riding, off-road trails.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top