Downpipe for BMW 3 Series: Nylon 66
This downpipe for the BMW 3 Series is specified around nylon 66, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Downpipe |
|---|---|
| Vehicle application | BMW 3 Series |
| Material / finish | Nylon 66 |
| Typical use | Weekend Riding |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | REACH |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- EPDM Rubber — specified where the part sits close to a heat source
- ABS Plastic — the cost-effective default for volume programmes
- Forged Aluminium — chosen where wear resistance comes first
- Brass — used when the finish has to hold a coating
- PVC Coated Fabric — specified where the part sits close to a heat source

Processes available
- powder coating
- anodising
- sintering
- CNC machining
- injection moulding
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include delivery fleets, construction sites, track days, rural transport, food delivery.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.







