Fuel Tank Cap for Great Wall Poer: Aluminium Alloy
This fuel tank cap for the Great Wall Poer is specified around aluminium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Fuel Tank Cap |
|---|---|
| Vehicle application | Great Wall Poer |
| Material / finish | Aluminium Alloy |
| Typical use | Motocross |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Bronze — used when the finish has to hold a coating
- Kevlar Composite — the cost-effective default for volume programmes
- Powder Coated Steel — preferred when weight matters more than rigidity
- Polypropylene — chosen where wear resistance comes first
- Zinc Plated Steel — specified where the part sits close to a heat source

Processes available
- electroplating
- powder coating
- heat treatment
- CNC machining
- surface grinding
- cold forging
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for motocross. Related applications include rural transport, off-road trails, mountain roads, track days, rental fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







