Steering Rack for Suzuki Swift: Kevlar Composite
This steering rack for the Suzuki Swift is specified around kevlar composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Steering Rack |
|---|---|
| Vehicle application | Suzuki Swift |
| Material / finish | Kevlar Composite |
| Typical use | Urban Courier Work |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | CCC |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Ceramic Composite — the cost-effective default for volume programmes
- Anodised Aluminium — used when the finish has to hold a coating
- Tempered Glass — chosen where wear resistance comes first
- Powder Coated Steel — the cost-effective default for volume programmes
- Silicone — chosen where wear resistance comes first

Processes available
- electroplating
- precision stamping
- CNC machining
- gravity casting
- robot welding
- laser cutting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for urban courier work. Related applications include urban courier work, heavy load hauling, motocross, farm use, coastal delivery.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







