Gearbox Mount for Ford Ranger: PVC Coated Fabric
This gearbox mount for the Ford Ranger is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Gearbox Mount |
|---|---|
| Vehicle application | Ford Ranger |
| Material / finish | PVC Coated Fabric |
| Typical use | Passenger Transport |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | ISO 9001 |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- PU Leather — selected when the part is exposed to weather and road salt
- Carbon Steel — used when the finish has to hold a coating
- Polypropylene — the cost-effective default for volume programmes
- ABS Plastic — used when the finish has to hold a coating
- High Density Foam — selected when the part is exposed to weather and road salt

Processes available
- CNC machining
- robot welding
- assembly line testing
- sintering
- anodising
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include coastal delivery, rental fleets, rural transport, adventure travel, off-road trails.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







