Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Line Kit for Mitsubishi Pajero: Sintered Metal

Fuel Line Kit for Mitsubishi Pajero: Sintered Metal

Fuel Line Kit for Mitsubishi Pajero: Sintered MetalThis fuel line kit for the Mitsubishi Pajero is specified around sintered metal, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Fuel Line Kit for Mitsubishi Pajero: Sintered Metal

This fuel line kit for the Mitsubishi Pajero is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or a specification nobody had written down. Both are specification problems, and both are preventable.

Mitsubishi Pajero Fuel Line Kit

Specification

ProductFuel Line Kit
Vehicle applicationMitsubishi Pajero
Material / finishSintered Metal
Typical useRental Fleets
MOQ200 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time20-40 days after approval
ComplianceISO/TS 16949
Packing100 pieces per inner box, 1000 per carton

Material options

  • Natural Rubber — specified where the part sits close to a heat source
  • Reinforced Nylon — selected when the part is exposed to weather and road salt
  • Polypropylene — preferred when weight matters more than rigidity
  • Carbon Fibre Composite — preferred when weight matters more than rigidity
  • Semi-Metallic Compound — chosen where wear resistance comes first

Fuel Line Kit detail

Processes available

  • laser cutting
  • precision stamping
  • cold forging
  • heat treatment
  • gravity casting
  • robot welding

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for rental fleets. Related applications include mountain roads, rental fleets, wet weather riding, off-road trails, roadside assistance.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top