Ignition Coil for Nissan X-Trail: Magnesium Alloy
This ignition coil for the Nissan X-Trail is specified around magnesium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Ignition Coil |
|---|---|
| Vehicle application | Nissan X-Trail |
| Material / finish | Magnesium Alloy |
| Typical use | Urban Courier Work |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | REACH |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- ABS Plastic — preferred when weight matters more than rigidity
- PVC Coated Fabric — selected when the part is exposed to weather and road salt
- Neoprene — selected when the part is exposed to weather and road salt
- Tempered Glass — the cost-effective default for volume programmes
- Semi-Metallic Compound — the cost-effective default for volume programmes

Processes available
- robot welding
- CNC machining
- precision stamping
- cold forging
- powder coating
- gravity casting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for urban courier work. Related applications include mountain roads, airport ground fleets, construction sites, roadside assistance, rental fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







