Power Steering Pump for Changan CS75: Chromed Steel
This power steering pump for the Changan CS75 is specified around chromed steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | Power Steering Pump |
|---|---|
| Vehicle application | Changan CS75 |
| Material / finish | Chromed Steel |
| Typical use | Mining Sites |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | ISO 9001 |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- Powder Coated Steel — used when the finish has to hold a coating
- Nylon 66 — used when the finish has to hold a coating
- Semi-Metallic Compound — used when the finish has to hold a coating
- Titanium Alloy — specified where the part sits close to a heat source
- Anodised Aluminium — chosen where wear resistance comes first
![]()
Processes available
- robot welding
- ultrasonic cleaning
- surface grinding
- injection moulding
- assembly line testing
- heat treatment
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for mining sites. Related applications include off-road trails, track days, wet weather riding, night riding, construction sites.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







