Idle Control Valve for Mitsubishi L200: Stainless Steel
This idle control valve for the Mitsubishi L200 is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Mitsubishi L200 |
| Material / finish | Stainless Steel |
| Typical use | Farm Use |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | REACH |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Nylon 66 — used when the finish has to hold a coating
- Anodised Aluminium — specified where the part sits close to a heat source
- Bronze — the cost-effective default for volume programmes
- Magnesium Alloy — preferred when weight matters more than rigidity
- Semi-Metallic Compound — used when the finish has to hold a coating

Processes available
- CNC machining
- shot blasting
- rubber vulcanisation
- powder coating
- injection moulding
- anodising
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for farm use. Related applications include construction sites, passenger transport, night riding, weekend riding, mining sites.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







