AC Evaporator for Suzuki Swift: Stainless Steel
This ac evaporator for the Suzuki Swift is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | AC Evaporator |
|---|---|
| Vehicle application | Suzuki Swift |
| Material / finish | Stainless Steel |
| Typical use | Rental Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | ISO 9001 |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Nylon 66 — preferred when weight matters more than rigidity
- Forged Aluminium — chosen where wear resistance comes first
- Brass — specified where the part sits close to a heat source
- High Density Foam — preferred when weight matters more than rigidity
- Semi-Metallic Compound — chosen where wear resistance comes first

Processes available
- assembly line testing
- shot blasting
- anodising
- heat treatment
- sintering
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include airport ground fleets, motocross, farm use, mining sites, long-distance touring.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







