Axle Shaft for BYD F3: Cast Iron
This axle shaft for the BYD F3 is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Axle Shaft |
|---|---|
| Vehicle application | BYD F3 |
| Material / finish | Cast Iron |
| Typical use | Coastal Delivery |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- PU Leather — preferred when weight matters more than rigidity
- Kevlar Composite — the cost-effective default for volume programmes
- PVC Coated Fabric — used when the finish has to hold a coating
- Tempered Glass — preferred when weight matters more than rigidity
- Cast Iron — chosen where wear resistance comes first

Processes available
- die casting
- injection moulding
- CNC machining
- precision stamping
- electroplating
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for coastal delivery. Related applications include delivery fleets, heavy load hauling, rental fleets, rural transport, ride-hailing fleets.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







