GPS Navigator for Chevrolet Silverado: Cast Iron
This gps navigator for the Chevrolet Silverado is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | GPS Navigator |
|---|---|
| Vehicle application | Chevrolet Silverado |
| Material / finish | Cast Iron |
| Typical use | Passenger Transport |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | IATF 16949 |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Natural Rubber — chosen where wear resistance comes first
- Chromed Steel — the cost-effective default for volume programmes
- Brass — used when the finish has to hold a coating
- Anodised Aluminium — preferred when weight matters more than rigidity
- EPDM Rubber — chosen where wear resistance comes first

Processes available
- rubber vulcanisation
- powder coating
- assembly line testing
- CNC machining
- shot blasting
- precision stamping
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include passenger transport, adventure travel, rural transport, wet weather riding, ride-hailing fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







