Fuel Pump for Audi Q5: Sintered Metal
This fuel pump for the Audi Q5 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Fuel Pump |
|---|---|
| Vehicle application | Audi Q5 |
| Material / finish | Sintered Metal |
| Typical use | Heavy Load Hauling |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | E-mark |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Anodised Aluminium — specified where the part sits close to a heat source
- Natural Rubber — selected when the part is exposed to weather and road salt
- Carbon Fibre Composite — specified where the part sits close to a heat source
- Chromed Steel — specified where the part sits close to a heat source
- Stainless Steel — used when the finish has to hold a coating

Processes available
- injection moulding
- die casting
- powder coating
- rubber vulcanisation
- heat treatment
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include off-road trails, passenger transport, mining sites, long-distance touring, roadside assistance.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







