Throttle Body for Honda Civic: Natural Rubber
This throttle body for the Honda Civic is specified around natural rubber, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Throttle Body |
|---|---|
| Vehicle application | Honda Civic |
| Material / finish | Natural Rubber |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | RoHS |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Tempered Glass — used when the finish has to hold a coating
- Nylon 66 — used when the finish has to hold a coating
- Sintered Metal — used when the finish has to hold a coating
- Brass — specified where the part sits close to a heat source
- Titanium Alloy — used when the finish has to hold a coating

Processes available
- heat treatment
- anodising
- die casting
- surface grinding
- gravity casting
- shot blasting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include wet weather riding, adventure travel, farm use, rental fleets, heavy load hauling.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







