Window Regulator for Chevrolet Captiva: Kevlar Composite
This window regulator for the Chevrolet Captiva is specified around kevlar composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Window Regulator |
|---|---|
| Vehicle application | Chevrolet Captiva |
| Material / finish | Kevlar Composite |
| Typical use | Wet Weather Riding |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | ISO 9001 |
| Packing | 20 pieces per inner box, 500 per carton |
Material options
- Anodised Aluminium — chosen where wear resistance comes first
- Semi-Metallic Compound — selected when the part is exposed to weather and road salt
- Cast Iron — used when the finish has to hold a coating
- PVC Coated Fabric — specified where the part sits close to a heat source
- Magnesium Alloy — chosen where wear resistance comes first

Processes available
- shot blasting
- cold forging
- powder coating
- sintering
- assembly line testing
- anodising
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for wet weather riding. Related applications include off-road trails, rural transport, motocross, track days, mountain roads.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







