Power Window Motor for Hyundai i20: ABS Plastic
This power window motor for the Hyundai i20 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Power Window Motor |
|---|---|
| Vehicle application | Hyundai i20 |
| Material / finish | ABS Plastic |
| Typical use | Rental Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | ISO 9001 |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- Titanium Alloy — used when the finish has to hold a coating
- Neoprene — selected when the part is exposed to weather and road salt
- Tempered Glass — used when the finish has to hold a coating
- High Density Foam — the cost-effective default for volume programmes
- Carbon Fibre Composite — chosen where wear resistance comes first

Processes available
- rubber vulcanisation
- surface grinding
- robot welding
- powder coating
- precision stamping
- laser cutting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include passenger transport, motocross, heavy load hauling, rural transport, ride-hailing fleets.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







