Tie Rod End for Suzuki Jimny: PVC Coated Fabric
This tie rod end for the Suzuki Jimny is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Tie Rod End |
|---|---|
| Vehicle application | Suzuki Jimny |
| Material / finish | PVC Coated Fabric |
| Typical use | Adventure Travel |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | DOT |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Anodised Aluminium — preferred when weight matters more than rigidity
- Natural Rubber — the cost-effective default for volume programmes
- High Density Foam — specified where the part sits close to a heat source
- Aluminium Alloy — the cost-effective default for volume programmes
- Nylon 66 — preferred when weight matters more than rigidity

Processes available
- robot welding
- die casting
- powder coating
- shot blasting
- heat treatment
- sintering
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for adventure travel. Related applications include passenger transport, long-distance touring, rental fleets, heavy load hauling, construction sites.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







