Flasher Unit for Lexus RX: ABS Plastic
This flasher unit for the Lexus RX is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Flasher Unit |
|---|---|
| Vehicle application | Lexus RX |
| Material / finish | ABS Plastic |
| Typical use | Construction Sites |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | ISO 9001 |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Brass — preferred when weight matters more than rigidity
- Polypropylene — the cost-effective default for volume programmes
- Cast Iron — used when the finish has to hold a coating
- EPDM Rubber — specified where the part sits close to a heat source
- Semi-Metallic Compound — used when the finish has to hold a coating

Processes available
- injection moulding
- robot welding
- rubber vulcanisation
- electroplating
- surface grinding
- ultrasonic cleaning
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include coastal delivery, farm use, track days, airport ground fleets, wet weather riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







