Gearbox Solenoid for Dodge Ram: Powder Coated Steel
This gearbox solenoid for the Dodge Ram is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or reorders that did not match the approved sample. Both are specification problems, and both are preventable.

Specification
| Product | Gearbox Solenoid |
|---|---|
| Vehicle application | Dodge Ram |
| Material / finish | Powder Coated Steel |
| Typical use | Long-Distance Touring |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | DOT |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- ABS Plastic — specified where the part sits close to a heat source
- Cast Iron — chosen where wear resistance comes first
- Brass — specified where the part sits close to a heat source
- Sintered Metal — specified where the part sits close to a heat source
- Zinc Plated Steel — the cost-effective default for volume programmes

Processes available
- electroplating
- anodising
- sintering
- injection moulding
- rubber vulcanisation
- shot blasting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for long-distance touring. Related applications include delivery fleets, adventure travel, security patrols, heavy load hauling, ride-hailing fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







