Sun Shade for Hyundai i20: Chromed Steel
This sun shade for the Hyundai i20 is specified around chromed steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Sun Shade |
|---|---|
| Vehicle application | Hyundai i20 |
| Material / finish | Chromed Steel |
| Typical use | Adventure Travel |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Forged Aluminium — preferred when weight matters more than rigidity
- Anodised Aluminium — specified where the part sits close to a heat source
- Neoprene — chosen where wear resistance comes first
- Kevlar Composite — the cost-effective default for volume programmes
- Tempered Glass — preferred when weight matters more than rigidity

Processes available
- injection moulding
- CNC machining
- cold forging
- anodising
- heat treatment
- surface grinding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for adventure travel. Related applications include motocross, wet weather riding, urban courier work, coastal delivery, farm use.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







