Idle Control Valve for Audi A4: Silicone
This idle control valve for the Audi A4 is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Audi A4 |
| Material / finish | Silicone |
| Typical use | Daily Commuting |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | SGS |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Kevlar Composite — chosen where wear resistance comes first
- Neoprene — selected when the part is exposed to weather and road salt
- EPDM Rubber — preferred when weight matters more than rigidity
- PU Leather — the cost-effective default for volume programmes
- Silicone — used when the finish has to hold a coating

Processes available
- surface grinding
- heat treatment
- ultrasonic cleaning
- robot welding
- shot blasting
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for daily commuting. Related applications include motocross, long-distance touring, rural transport, ride-hailing fleets, night riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







