Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Line Kit for Mercedes-Benz Sprinter: Ceramic Composite

Fuel Line Kit for Mercedes-Benz Sprinter: Ceramic Composite

Fuel Line Kit for Mercedes-Benz Sprinter: Ceramic CompositeThis fuel line kit for the Mercedes-Benz Sprinter is specified around ceramic composite, which decides how it behaves in service far more.

Contact Number:
Product Details

Fuel Line Kit for Mercedes-Benz Sprinter: Ceramic Composite

This fuel line kit for the Mercedes-Benz Sprinter is specified around ceramic composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Mercedes-Benz Sprinter Fuel Line Kit

Specification

ProductFuel Line Kit
Vehicle applicationMercedes-Benz Sprinter
Material / finishCeramic Composite
Typical useDaily Commuting
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time20-30 days after approval
ComplianceSAE J431
Packing50 pieces per inner box, 500 per carton

Material options

  • Forged Aluminium — selected when the part is exposed to weather and road salt
  • Chromed Steel — chosen where wear resistance comes first
  • Neoprene — used when the finish has to hold a coating
  • Nylon 66 — specified where the part sits close to a heat source
  • Bronze — preferred when weight matters more than rigidity

Fuel Line Kit detail

Processes available

  • ultrasonic cleaning
  • assembly line testing
  • shot blasting
  • powder coating
  • anodising
  • robot welding

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for daily commuting. Related applications include construction sites, rental fleets, mining sites, passenger transport, urban courier work.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top