Welcome to Auto, Motorcycle Parts & Accessories official website!
Alternator for Audi A4: Powder Coated Steel

Alternator for Audi A4: Powder Coated Steel

Alternator for Audi A4: Powder Coated SteelThis alternator for the Audi A4 is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build.

Contact Number:
Product Details

Alternator for Audi A4: Powder Coated Steel

This alternator for the Audi A4 is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or premature wear on the first batch. Both are specification problems, and both are preventable.

Audi A4 Alternator

Specification

ProductAlternator
Vehicle applicationAudi A4
Material / finishPowder Coated Steel
Typical useConstruction Sites
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-55 days after approval
ComplianceSGS
Packing50 pieces per inner box, 200 per carton

Material options

  • Nylon 66 — selected when the part is exposed to weather and road salt
  • Chromed Steel — selected when the part is exposed to weather and road salt
  • Forged Aluminium — chosen where wear resistance comes first
  • High Density Foam — preferred when weight matters more than rigidity
  • Aluminium Alloy — preferred when weight matters more than rigidity

Alternator detail

Processes available

  • heat treatment
  • anodising
  • ultrasonic cleaning
  • injection moulding
  • assembly line testing
  • rubber vulcanisation

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include motocross, night riding, urban courier work, mountain roads, ride-hailing fleets.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top