Power Steering Hose for Hyundai Tucson: Powder Coated Steel
This power steering hose for the Hyundai Tucson is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Power Steering Hose |
|---|---|
| Vehicle application | Hyundai Tucson |
| Material / finish | Powder Coated Steel |
| Typical use | Motocross |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 20 pieces per inner box, 500 per carton |
Material options
- Sintered Metal — preferred when weight matters more than rigidity
- Powder Coated Steel — the cost-effective default for volume programmes
- Reinforced Nylon — specified where the part sits close to a heat source
- Magnesium Alloy — chosen where wear resistance comes first
- Silicone — specified where the part sits close to a heat source

Processes available
- injection moulding
- laser cutting
- sintering
- precision stamping
- anodising
- electroplating
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for motocross. Related applications include construction sites, roadside assistance, heavy load hauling, adventure travel, passenger transport.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







