Blower Motor for Ford Ranger: Semi-Metallic Compound
This blower motor for the Ford Ranger is specified around semi-metallic compound, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Blower Motor |
|---|---|
| Vehicle application | Ford Ranger |
| Material / finish | Semi-Metallic Compound |
| Typical use | Rental Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | CCC |
| Packing | 10 pieces per inner box, 1000 per carton |
Material options
- Carbon Fibre Composite — preferred when weight matters more than rigidity
- Kevlar Composite — specified where the part sits close to a heat source
- Semi-Metallic Compound — the cost-effective default for volume programmes
- Ceramic Composite — preferred when weight matters more than rigidity
- Magnesium Alloy — the cost-effective default for volume programmes

Processes available
- robot welding
- rubber vulcanisation
- precision stamping
- assembly line testing
- sintering
- CNC machining
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include passenger transport, urban courier work, delivery fleets, adventure travel, mining sites.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







