Welcome to Auto, Motorcycle Parts & Accessories official website!
Heater Hose for Changan CS75: Powder Coated Steel

Heater Hose for Changan CS75: Powder Coated Steel

Heater Hose for Changan CS75: Powder Coated SteelThis heater hose for the Changan CS75 is specified around powder coated steel, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Heater Hose for Changan CS75: Powder Coated Steel

This heater hose for the Changan CS75 is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Changan CS75 Heater Hose

Specification

ProductHeater Hose
Vehicle applicationChangan CS75
Material / finishPowder Coated Steel
Typical useTrack Days
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time20-40 days after approval
ComplianceDOT
Packing20 pieces per inner box, 500 per carton

Material options

  • Chromed Steel — chosen where wear resistance comes first
  • Stainless Steel — preferred when weight matters more than rigidity
  • Natural Rubber — chosen where wear resistance comes first
  • Tempered Glass — specified where the part sits close to a heat source
  • Kevlar Composite — selected when the part is exposed to weather and road salt

Heater Hose detail

Processes available

  • rubber vulcanisation
  • assembly line testing
  • powder coating
  • cold forging
  • injection moulding
  • sintering

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for track days. Related applications include wet weather riding, daily commuting, airport ground fleets, night riding, coastal delivery.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top