Idle Control Valve for Great Wall Poer: Cast Iron
This idle control valve for the Great Wall Poer is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Great Wall Poer |
| Material / finish | Cast Iron |
| Typical use | Daily Commuting |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | DOT |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Sintered Metal — specified where the part sits close to a heat source
- Kevlar Composite — chosen where wear resistance comes first
- Brass — preferred when weight matters more than rigidity
- Ceramic Composite — the cost-effective default for volume programmes
- ABS Plastic — the cost-effective default for volume programmes

Processes available
- sintering
- powder coating
- robot welding
- shot blasting
- anodising
- surface grinding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for daily commuting. Related applications include night riding, roadside assistance, food delivery, urban courier work, rural transport.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







