Transmission Mount for Mazda BT-50: Tempered Glass
This transmission mount for the Mazda BT-50 is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | Transmission Mount |
|---|---|
| Vehicle application | Mazda BT-50 |
| Material / finish | Tempered Glass |
| Typical use | Track Days |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | ISO 9001 |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Silicone — preferred when weight matters more than rigidity
- Zinc Plated Steel — preferred when weight matters more than rigidity
- Stainless Steel — specified where the part sits close to a heat source
- EPDM Rubber — the cost-effective default for volume programmes
- PVC Coated Fabric — specified where the part sits close to a heat source

Processes available
- injection moulding
- shot blasting
- robot welding
- ultrasonic cleaning
- laser cutting
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for track days. Related applications include daily commuting, airport ground fleets, ride-hailing fleets, construction sites, weekend riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







