Radiator for Ford Ranger: Anodised Aluminium
This radiator for the Ford Ranger is specified around anodised aluminium, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Radiator |
|---|---|
| Vehicle application | Ford Ranger |
| Material / finish | Anodised Aluminium |
| Typical use | Construction Sites |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | DOT |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Tempered Glass — chosen where wear resistance comes first
- ABS Plastic — the cost-effective default for volume programmes
- Semi-Metallic Compound — chosen where wear resistance comes first
- Silicone — specified where the part sits close to a heat source
- Aluminium Alloy — preferred when weight matters more than rigidity

Processes available
- assembly line testing
- precision stamping
- robot welding
- surface grinding
- rubber vulcanisation
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include adventure travel, airport ground fleets, weekend riding, roadside assistance, track days.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







