Stabilizer Link for Mazda CX-5: Aluminium Alloy
This stabilizer link for the Mazda CX-5 is specified around aluminium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or reorders that did not match the approved sample. Both are specification problems, and both are preventable.

Specification
| Product | Stabilizer Link |
|---|---|
| Vehicle application | Mazda CX-5 |
| Material / finish | Aluminium Alloy |
| Typical use | Long-Distance Touring |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | REACH |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Chromed Steel — preferred when weight matters more than rigidity
- Sintered Metal — selected when the part is exposed to weather and road salt
- Semi-Metallic Compound — preferred when weight matters more than rigidity
- Forged Aluminium — used when the finish has to hold a coating
- Brass — selected when the part is exposed to weather and road salt

Processes available
- CNC machining
- surface grinding
- laser cutting
- anodising
- sintering
- heat treatment
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for long-distance touring. Related applications include long-distance touring, rental fleets, night riding, mountain roads, rural transport.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







