Steering Column for Nissan Patrol: Brass
This steering column for the Nissan Patrol is specified around brass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Steering Column |
|---|---|
| Vehicle application | Nissan Patrol |
| Material / finish | Brass |
| Typical use | Coastal Delivery |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | ISO 9001 |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Magnesium Alloy — used when the finish has to hold a coating
- Brass — the cost-effective default for volume programmes
- Sintered Metal — preferred when weight matters more than rigidity
- Zinc Plated Steel — selected when the part is exposed to weather and road salt
- ABS Plastic — preferred when weight matters more than rigidity

Processes available
- injection moulding
- robot welding
- powder coating
- surface grinding
- electroplating
- sintering
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for coastal delivery. Related applications include wet weather riding, track days, heavy load hauling, night riding, rural transport.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







