Timing Belt for Honda CR-V: Cast Iron
This timing belt for the Honda CR-V is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Timing Belt |
|---|---|
| Vehicle application | Honda CR-V |
| Material / finish | Cast Iron |
| Typical use | Rental Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | REACH |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Kevlar Composite — specified where the part sits close to a heat source
- Titanium Alloy — preferred when weight matters more than rigidity
- Zinc Plated Steel — specified where the part sits close to a heat source
- Natural Rubber — chosen where wear resistance comes first
- Carbon Steel — chosen where wear resistance comes first

Processes available
- precision stamping
- electroplating
- surface grinding
- heat treatment
- laser cutting
- injection moulding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include construction sites, long-distance touring, rural transport, mining sites, track days.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







