Welcome to Auto, Motorcycle Parts & Accessories official website!
Coil Spring for Kia Sportage: Brass

Coil Spring for Kia Sportage: Brass

Coil Spring for Kia Sportage: BrassThis coil spring for the Kia Sportage is specified around brass, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

Coil Spring for Kia Sportage: Brass

This coil spring for the Kia Sportage is specified around brass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or reorders that did not match the approved sample. Both are specification problems, and both are preventable.

Kia Sportage Coil Spring

Specification

ProductCoil Spring
Vehicle applicationKia Sportage
Material / finishBrass
Typical useWeekend Riding
MOQ1,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-40 days after approval
ComplianceISO 9001
Packing100 pieces per inner box, 200 per carton

Material options

  • Anodised Aluminium — the cost-effective default for volume programmes
  • Carbon Fibre Composite — the cost-effective default for volume programmes
  • Stainless Steel — the cost-effective default for volume programmes
  • Brass — selected when the part is exposed to weather and road salt
  • Aluminium Alloy — the cost-effective default for volume programmes

Coil Spring detail

Processes available

  • surface grinding
  • anodising
  • die casting
  • CNC machining
  • electroplating
  • rubber vulcanisation

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for weekend riding. Related applications include ride-hailing fleets, adventure travel, daily commuting, passenger transport, off-road trails.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top