Welcome to Auto, Motorcycle Parts & Accessories official website!
Oil Cooler for Changan CS75: Neoprene

Oil Cooler for Changan CS75: Neoprene

Oil Cooler for Changan CS75: NeopreneThis oil cooler for the Changan CS75 is specified around neoprene, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

Oil Cooler for Changan CS75: Neoprene

This oil cooler for the Changan CS75 is specified around neoprene, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Changan CS75 Oil Cooler

Specification

ProductOil Cooler
Vehicle applicationChangan CS75
Material / finishNeoprene
Typical useFarm Use
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceSGS
Packing10 pieces per inner box, 200 per carton

Material options

  • Natural Rubber — selected when the part is exposed to weather and road salt
  • Reinforced Nylon — specified where the part sits close to a heat source
  • ABS Plastic — selected when the part is exposed to weather and road salt
  • Forged Aluminium — selected when the part is exposed to weather and road salt
  • Brass — used when the finish has to hold a coating

Oil Cooler detail

Processes available

  • shot blasting
  • powder coating
  • ultrasonic cleaning
  • surface grinding
  • CNC machining
  • precision stamping

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for farm use. Related applications include long-distance touring, ride-hailing fleets, urban courier work, weekend riding, mountain roads.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top